Opens in a new tab
REQUEST NOW
Data protection

Chalk and Lime Silos for Wastewater Treatment Plants and Wastewater Technology in Bremen

Our GRP chalk and lime silos are used in municipal and industrial wastewater technology, offering a reliable solution for the storage and demand-oriented dosing of chalk and lime. Whether for wastewater treatment plants, wastewater utilities, or projects by engineering firms and plant manufacturers in Bremen and the surrounding area – we offer individually tailored silo solutions for various requirements.

What are chalk and lime silos and why are they used?

Chalk and lime silos serve for the safe storage and demand-oriented dosing of chalk and lime. They are primarily used in municipal and industrial wastewater treatment plants, where the dosed substances contribute to pH value stabilization and acid capacity regulation. This creates optimal conditions for biological purification processes and supports reliable wastewater treatment.

The silos are made of glass-reinforced plastic (GRP), which is characterized by its high corrosion resistance and durability. In combination with automated dosing technology, they enable a uniform, reliable, and demand-oriented material supply.

Contact us now

The composition of wastewater can vary significantly depending on its origin and load. In particular, changes in acid load can influence the chemical balance in the wastewater and impair the effectiveness of the purification processes. Through the targeted use of suitable chalk and lime products, such fluctuations can be compensated and the necessary process conditions maintained. It is crucial that the type and quantity of material used are matched to the respective wastewater composition.

Are chalk and lime silos relevant for you?

Chalk and lime silos are used wherever reliable storage and controlled dosing of materials are required. Especially in municipal and industrial wastewater treatment plants, they play an important role in ensuring stable purification processes.

Key areas of application in Bremen and the surrounding area include municipal wastewater utilities, wastewater and special purpose associations, as well as industrial wastewater treatment plants, for example, in the food, paper, or chemical industries. Furthermore, our silos are of interest to engineering firms and plant manufacturers in the water and wastewater technology sector who are planning new facilities or modernizing existing systems.

Thanks to their individual design, our chalk and lime silos can be adapted to your operational requirements and structural conditions. This way, we also offer suitable solutions for projects in Bremen for a reliable and demand-oriented material supply.

Request now

Supply security through proactive material stocking

In wastewater treatment, continuous availability of the required input materials is crucial. Sufficient stocking of chalk and lime helps to bridge supply bottlenecks and avoid interruptions in plant operation. The daily material consumption, delivery intervals, and available storage capacities play an important role here. Proactive planning thus creates the basis for a reliable and economical material supply.

What advantages do our GRP chalk and lime silos offer?

  • High corrosion resistance: GRP is particularly resistant even in demanding and aggressive environments.
  • Durable construction: The robust and reinforced design ensures high stability and a long service life.
  • Reliable material flow: Smooth inner walls and a steep discharge cone support uniform emptying.
  • Low maintenance: The well-thought-out design reduces deposits and minimizes maintenance requirements.
  • Automated dosing: The coordinated conveying and control technology enables a uniform and demand-oriented material supply.
  • Individual adaptation: Silo size, conveying technology, and control can be flexibly adapted to the respective plant requirements.

How is a GRP chalk and lime silo constructed?

Our GRP chalk and lime silo consists of several coordinated components that enable safe storage and controlled material withdrawal.

The core is the robust GRP silo body with a reinforced substructure. The smooth inner walls and the long discharge cone with an inclination of 67° support the reliable emptying of the stored material. Depending on requirements, silo sizes with a capacity of up to 120 m³ are available.

The technical equipment includes, among other things, filling and ventilation lines made of stainless steel, a pressure equalization valve, and level indicators for monitoring the material supply. A vibrator can be used if necessary to break up possible product bridges and maintain material flow.

An exhaust air filter ensures the separation of dust generated during silo filling. The individual components are coordinated and form a functional overall system.

How does automatic chalk and lime dosing work?

The dosing of chalk and lime is carried out via a specially designed tube screw conveyor, which discharges the material from the silo in a controlled manner and feeds it to the intended point of use.

The screw conveyor is made of stainless steel and is equipped with specially matched screw flights that enable the most uniform material conveying possible. Length and inclination are adapted to your structural conditions and individual requirements already during the project planning phase.

Various options are available for control. For time-controlled dosing, your desired operating times and start times are set. The material supply then takes place automatically. Alternatively, dosing can be carried out via a silo scale, allowing precisely defined material quantities to be discharged.

Integration into an existing PLC plant control system is also possible. This allows the dosing system to be integrated into your existing operational processes.

What individual equipment options are available?

Every plant places different demands on storage capacity, material conveying, and control. Therefore, we can the GRP chalk and lime silos individually adapt to your operating conditions.

In addition to different silo sizes, for example, the length and inclination of the screw conveyor, the design of the dosing technology, and the level monitoring can be customized for each project.

Additional level indicators enable the monitoring of minimum quantities or the timely notification of required material replenishment. Various control concepts – from simple time-controlled dosing to integration into existing process control systems – are also feasible.

This results in a silo and dosing solution tailored to your specific application.

Chalk and Lime Silos in Practice

Whether for modernizing existing wastewater treatment plants or planning new wastewater treatment systems – GRP chalk and lime silos can be integrated into various plant concepts.

The combination of a corrosion-resistant silo body, reliable discharge technology, and automated dosing enables largely autonomous operation. Through individual adaptation of the components, both local space conditions and operational requirements can be taken into account.

Practical examples and reference plants show how the different technical designs can be used in municipal and industrial wastewater treatment.

Your Contact for Chalk and Lime Silos in Bremen

Are you looking for a suitable chalk or lime dosing system for your project in Bremen? We advise you on our GRP silos, the technical equipment options, and the appropriate dosing technology. Together, we will find a solution tailored to the requirements of your plant.

Have we sparked your interest?

Are you interested in our solutions or would you like to learn more about our offerings?

Contact us—we are here for you!

Contact us now